DBK Performance Dry out Equipment

Category: MITIGATION

Principal Author: Mark Whatley

Actionable Insights Board Approval: 04-02-2017

Tags:  Thermal Heat, DBK, Performance Drying, Mats, Booster, Dehu, Coil Ducting

Rating:

This assumes a multi-level Class 3 | CAT 1 water loss. DBK performance drying equipment was exclusively employed (Power Distribution Boxes notwithstanding). The project required extensive remote monitoring. The sensors that were deployed on the the second level were unable to connect to the primary gateway located on the first floor. In response to this, a secondary gateway was deployed upstairs, flanked by 6 auxiliary sensors.

Ultimately the performance drying was successful in its efforts to mitigate additional damages and manage the overarching claim cost (assumes a substantial reduction to the repair scope).

This Insight Sheet exists to clarify how one might invoice for a DBK Drymatic System.

The AI Board remains keen to highlight the fact that certain Wall/Floor Mats Systems require varying quantities of Boost Boxes & Air Movers, please see the DBK Quick Reference Guide.


Water Heater D&R w/ Code Upgrades

Category: MITIGATION

Contributer: jennifer patrick, NationWide Private Client

Al board Approval: 04.02.2017

Tags:  Thermal DBK, performance, Masts, booster

Rating:

This assumes a multi-level water loss (Class 3 I Cat 1). DBK performance drying equipment was exclusively employed (Power Distribution Boxes notwithstanding). The project required extensive remote monitoring. The sensors that were deployed on the the second level remained unable to connect to the primary gateway located on the first floor. In response to this, a sec¬ondary gateway was deployed upstairs, it was flanked by 6 auxiliary sensors.

Ultimately the performance drying was successful in its efforts to mitigate additional damages and manage the overarching claim cost (assumes a substantial reduction to the repair scope). This Insight Sheet exist to clarify how one might invoice for a DBK Drymatic System. Al remains been to highlight the fact that certain Wall/Floor Mats Systems require varying quantities of Boost Boxes & Air Movers, please see the DBK Quick Reference Guide.


Injectidry Systems

Category: MITIGATION

Contributer: jennifer patrick, NationWide Private Client

Al board Approval: 04.02.2017

Tags:  Thermal DBK, performance, Masts, booster

Rating:

In this performance dry out scenario, set the stage in a high-end residential property. The property recently suffered a (Cat 1 I Class II) water loss. The contractor was able to respond and extract the same day. The primary objective was illustrate how the entire suite Injectidry products can be invoiced for. The overarching goal was leverage the Injectidry performance dry out tools such that the flooring, cabinets, drywall and other related building materials could be dried in place and retained.


High Grade Shower Surround

Category: MITIGATION

Contributer: jennifer patrick, NationWide Private Client

Al board Approval: 04.02.2017

Tags:  Thermal DBK, performance, Masts, booster

Rating:

The high grade shower surround displayed all manner of detail. This is not a typical shower surround. The complexity of this Insight Sheet was championed by the interest of the Board to highlight the obscure aspects of a shower surround, so that the estimator/adjuster can cherry pick the line items that apply to the loss that they have at hand.