Search
Filter by Custom Post Type
Filter by Categories
Mitigation
Repair

TES 250k Trailer

Category: Mitigation

Principal Author(s): Mark Whatley, Seth Harrison

Key Contributor(s): David Mattioli, Dan Smith

AI Board Approval: 06/14/2017

Last Update: 07/15/2017

Tags: Decontamination, Equipment, Performance Drying, Rental, TES 250k Trailer, Thermal, Trailer

5 votes, average: 5.00 out of 55 votes, average: 5.00 out of 55 votes, average: 5.00 out of 55 votes, average: 5.00 out of 55 votes, average: 5.00 out of 5 (5 votes, average: 5.00 out of 5)
You need to be a registered member to rate this.
Loading...

Download Macro*
*Download Requires Plus Plan Subscription

This assumes a multi-level water loss (Class 3 | Cat 3). Prior to the loss, the area had experienced record low temperatures and this subsequently caused a drain pipe to rupture. There was standing black water that had transitioned into ice. The contaminated ice factor created a need for a significant amount of heat to be pumped into the property in a timely manner. As such, the restoration contractor called upon the TES 250k in an effort to dry down the frigid property. TES performance drying equipment was exclusively employed.

This Insight Sheet exists to clarify how one might invoice TES 250k Trailer. This does not seek to include or make concessions for all equipment and/or activities as it relates to a loss of this nature.