Price List Commentary & New Line Items – September 2017

Have you identified a need for a new line item? Submit your request here.

Items modified for the September 2017 price lists

1. CLNACW> Added text to Note field of (+) definition to explain estimator may need to review item assumptions if removal and reinstallation of a through-wall unit is required as part of the cleaning process.
2. EQUDLVR Modified description to reference the item is for rental equipment delivery/mobilization.
3. HMREQD Modified (+) assembly and (+) definition to represent decontaminating equipment with a wipe-down process rather than with pressure washing.
4. HMREQDH Modified (+) assembly and (+) definition to represent decontaminating equipment with a wipe-down process rather than with pressure washing.
5. HMRPPE Modified (+) definition to clarify item includes disposable coveralls with attached hood and boots, and that users may need to verify local or state mandated PPE requirements to determine if assumptions in the item are sufficient to cover their specific scenario.
6. HMRPPE+ Modified (+) definition to clarify item includes disposable coveralls with attached hood and boots, and that users may need to verify local or state mandated PPE requirements to determine if assumptions in the item are sufficient to cover their specific scenario.
7. RFG300 Modified yield of material component RFG300 in (+) assembly to be one square and removed text in Note field of (+) definition that referenced the material component yield was based on typical actual square footage of purchased shingles as listed by major manufacturers. We have found that typically roofers use one square as the material yield even though each manufacturer’s actual coverage may have a very minimal difference.
8. RFG300S Modified yield of material component RFG300 in (+) assembly to be one square and removed text in Note field of (+) definition that referenced the material component yield was based on typical actual square footage of purchased shingles as listed by major manufacturers. We have found that typically roofers use one square as the material yield even though each manufacturer’s actual coverage may have a very minimal difference.
9. RFGFLCH* Modified (+) assembly and Included field of (+) definition to include assumptions for ice and water shield.
10. RFGMTLRV Added (R) activity.
11. RFGMTLRV- Added (R) activity.
12. RFGMTLRV+ Added (R) activity.
13. RFGNRP300 Modified yield of material component RFG300 in (+) assembly to be one square and removed text in Note field of (+) definition that referenced the material component yield was based on typical actual square footage of purchased shingles as listed by major manufacturers. We have found that typically roofers use one square as the material yield even though each manufacturer’s actual coverage may have a very minimal difference.
14. RFGNRP300S Modified yield of material component RFG300 in (+) assembly to be one square and removed text in Note field of (+) definition that referenced the material component yield was based on typical actual square footage of purchased shingles as listed by major manufacturers. We have found that typically roofers use one square as the material yield even though each manufacturer’s actual coverage may have a very minimal difference.
15. TCREQD Modified (+) assembly and (+) definition to represent decontaminating equipment with a wipe-down process rather than with pressure washing.
16. TCREQDH Modified (+) assembly and (+) definition to represent decontaminating equipment with a wipe-down process rather than with pressure washing.
17. TCRPPE Modified (+) definition to clarify item includes disposable coveralls with attached hood and boots, and that users may need to verify local or state mandated PPE requirements to determine if assumptions in the item are sufficient to cover their specific scenario.
18. TCRPPE+ Modified (+) definition to clarify item includes disposable coveralls with attached hood and boots, and that users may need to verify local or state mandated PPE requirements to determine if assumptions in the item are sufficient to cover their specific scenario.
19. WTREQD Modified (+) assembly and (+) definition to represent decontaminating equipment with a wipe-down process rather than with pressure washing.
20. WTREQDH Modified (+) assembly and (+) definition to represent decontaminating equipment with a wipe-down process rather than with pressure washing.
21. WTRPPE Modified (+) definition to clarify item includes disposable coveralls with attached hood and boots, and that users may need to verify local or state mandated PPE requirements to determine if assumptions in the item are sufficient to cover their specific scenario.
22. WTRPPE+ Modified (+) definition to clarify item includes disposable coveralls with attached hood and boots, and that users may need to verify local or state mandated PPE requirements to determine if assumptions in the item are sufficient to cover their specific scenario.

Material Components added for the September 2017 price lists
1. FCRFTI Foam / Soft rubber tile – interlocking – up to 1/2"
2. FCRFTI> Foam / Soft rubber tile – interlocking – 5/8" to 1"
3. FCRSAFET1 Interlocking Safety rubber tiles – up to 1.5" (w/dowels)
4. FCRSAFET2 Interlocking Safety rubber tiles – 1.75" to 2.5" (w/dowels)
5. FCRSAFET3 Interlocking Safety rubber tiles – over 2.5" (w/dowels)
6. FCRSAFETA Polyurethane adhesive for rubber tiles
7. FCRSAFETR1 Safety rubber tile ramp/reducer strip – up to 1.5"
8. FCRSAFETR2 Safety rubber tile ramp/reducer strip – 1.75" to 2.5"
9. FCRSAFETR3 Safety rubber tile ramp/reducer strip – over 2.5"

Future changes and additions to look for in upcoming price list publications
1. Item(s) for wood composite fencing.
2. Item(s) for sealing open-stud wall or joist system with anti-microbial coating.

* Signifies changes to multiple items with similar selectors.